Replacement of thermal insulation at El Caracol and Los Indios compression stations
1.- Inspection: Damaged thermal insulation in suction and discharge lines in centrifugal turbocharger compressors. 2.- Action: Removal of damaged thermal insulation. 3.- Correction: Manufacturing and assembly of thermal insulation. Description: Replacement of thermal insulation. Complete successful project: 100%. Problem: Damaged insulation. Solution: Insulation replacement. Process: Inspection of damaged insulation/ Disassembly of insulation/ […]
centrifugal compressor maintenance
DESCRIPTION Centrifugal compressor maintenance PROJECT COMPLETED SUCCESSFUL 100% PROBLEM Leakage in mechanical seal SOLUTION Replacement of mechanical seals PROCESS Correct maintenance of centrifugal compressor by replacing mechanical seals.
Aerocondenser system maintenance
DESCRIPTION Maintenance of the air condenser system COMPLETE SUCCESSFUL PROJECT 100% PROBLEM Annual scheduled maintenance SOLUTION Preventive maintenance with respect to customer job plan PROCESS Replacement of reducer filters, cleaning of panels, replacement of reducer oil, blade attack angle alignment, torque on blade clamps.
Titan 130 solar turbine maintenance
DESCRIPTION Maintenance of titan 130 solar turbine COMPLETE SUCCESSFUL PROJECT 100% PROBLEM Scheduled maintenance semi-annual 4000 hr SOLUTION Preventive maintenance with respect to customer job plan PROCESS Borescope, filter replacement, ejector washing, axial compressor washing, instrument calibration
Annual shutdown (Maintenance)
Description: Repair of cracks inside the exhaust of gas turbines applying argon gas (tig) and application of penetrating liquids. Date: 01/18/2023 Location: INVENERGY
Decoupling HP and LP modules in GE-10 turbochargers
DESCRIPTION Dismantling of GENERAL ELECTRIC turbocharger model GE-10 COMPLETE SUCCESSFUL PROJECT 100% PROBLEM Replacement of gas turbocharger SOLUTION Decoupling of gas turbocharger PROCESS Decoupling of gas turbocharger to be replaced Disassembling auxiliary equipment and being protected.
Replacement of thermowells/radiation shield
DESCRIPTION Replacement of thermowells/radiation shield PROJECT COMPLETED SUCCESSFUL 100% PROBLEM Damaged thermowell SOLUTION Replacement of thermowells/radiation shield PROCESS Replacement of thermowells/radiation shield applying TIG welding and performing liquid penetrants.
Vibration analysis in dynamic systems
DESCRIPTION Vibration analysis of dynamic equipment PROJECT COMPLETED SUCCESSFUL 100% PROBLEM Scheduled maintenance SOLUTION Vibration analysis of dynamic equipment PROCESS Vibration analysis of dynamic equipment with fluke 810 equipment
Corrective maintenance to VTF.
DESCRIPTION Maintenance of forced draft fan of 2 boilers in GPE NL PROJECT COMPLETED SUCCESSFUL 100% PROBLEM Damage to bearings due to misalignment SOLUTION Replacement of bearings and alignment PROCESS Replacement of bearings, application of high-temperature grease. As well as alignment and vibration analysis.
Washing of axial compressor in GE/10 turbine
DESCRIPTION Axial compressor flush PROJECT COMPLETED SUCCESSFUL 100% PROBLEM Scheduled maintenance SOLUTION Axial compressor flush in coordination with BAKER Hughes PROCESS Axial compressor flush application in GE/10 turbine in coordination with baker hughes personnel