Fiber optic maintenance in HGPI.
Beautiful Valley Center
Administration staff.
lenova system San Fernando Station Los Indios / Caracol
Repair of check in fire system.
Central Los Ramones Nuevo Leon
Repair of PSV in fuel gas system.
DESCRIPTION Maintenance to PSV PROJECT COMPLETED SUCCESSFUL 100% PROBLEM Scheduled maintenance SOLUTION Major maintenance to PSV PROCESS Major maintenance to PSV re-lapping valve seat and plug as well as pre-pop tests
Alignment of demineralized water system pumps.
Central Los Ramones Nuevo Leon
Dismantling of pumps and auxiliary motors in turbine casing.
lenova system San Fernando Station Los Indios / Caracol
Corrective maintenance to HGPI instrumentation.
DESCRIPTION Corrective maintenance to CVH instrumentation PROJECT COMPLETED SUCCESSFUL 100% PROBLEM Scheduled maintenance SOLUTION Major maintenance to instrumentation PROCESS Major maintenance to instrumentation Replacement of control valves, motorized actuators as well as their calibration and calibration to analog instrumentation.
Dismantling of centrifugal compressor in PK 191.
Lenova sistema DESCRIPTION Disassembly of centrifugal compressor for protection. PROJECT COMPLETED SUCCESSFUL 100% PROBLEM Replacement of centrifugal compressor SOLUTION Disassembly of centrifugal compressor for protection. PROCESS Decoupling of the centrifugal compressor from the gas turbine as well as its disassembly for its protection
Decoupling of HP and LP modules in GE-10 turbocharger at PK 191.
lenova system San Fernando Station Los Indios / Caracol
Removal of DLN/Liner on G10 turbocharger on PK191.
Lenova sistema DESCRIPTION Replacement of liner in GENERAL ELECTRIC gas turbines COMPLETE PROJECT SUCCESSFUL 100% PROBLEM Crack in liner SOLUTION Replacement of liner PROCESS Disassembly of DLN as well as replacement of combustion chamber (liner), assembly of DLN and commissioning.