Corrective maintenance to VTF.
DESCRIPTION Maintenance of forced draft fan of 2 boilers in GPE NL PROJECT COMPLETED SUCCESSFUL 100% PROBLEM Damage to bearings due to misalignment SOLUTION Replacement of bearings and alignment PROCESS Replacement of bearings, application of high-temperature grease. As well as alignment and vibration analysis.
Maintenance to gas air cooler system.
Camargo compression station
Washing of axial compressor in GE/10 turbine
DESCRIPTION Axial compressor flush PROJECT COMPLETED SUCCESSFUL 100% PROBLEM Scheduled maintenance SOLUTION Axial compressor flush in coordination with BAKER Hughes PROCESS Axial compressor flush application in GE/10 turbine in coordination with baker hughes personnel
Maintenance to ignition system in TG and HRSG
Central Lomas del Real
Fiber optic maintenance.
Central Lomas del Real
Installation of transmitters in HRSG 1 and HRSG 2
Central Anahuac
Modifying maintenance to steam system in HRGS.
Beautiful Valley Center
Replacement of interconnection boxes in diesel system.
Central Lomas del Real
Maintenance to spark plugs flame detectors HGPI
Central Lomas del Real